It is hard to say when we will complete the final two phases of the remodel. We are all ready to take a break away from our labors and the dust. It is so good to be back into a real bedroom with clothes hanging on hanger in a real closet and not living out of boxes!
This weekend, we plan to move the office out of the basement and up into the open loft area. Before we do that, John needs to lift the carpet and subfloor in the loft to run some wiring so Whitley can have an overhead light and ceiling fan in her bedroom, which is directly below the loft.
The final two phases of this remodel consist of: 1- hardwood floors upstairs, built in floor to ceiling bookcases in the loft 2-heading back to the kitchen and converting what was the old laundry into a pantry and a space to build in the side by side fridge. Where the fridge once was, will be a work station for the laptop, paying bills, phonebooks.
Until then we plan to rest well at night in our new master bedroom!
No comments:
Post a Comment