The county roof inspector popped in for a "mid-roof inspection" and John passed with flying colors!
He and the inspector chatted for a bit and he told John it wasn't necessary to do the other side since it had south west exposure and did not dam up.
But how were the two sides going to meet at the ridge vent if one side was thicker/higher???
Well, you simply cut the difference off the ridge vent on the lower side! Apparently this is totally acceptable with the county! So....John only has to do one side and the job is officially done after 4 LOOONNNNNG, HOT days!
Another bonus is, we loaded up the other half off the materials, returned them to Home Depot and put $500 back in to savings! PTL!!!